高清无码加勒比图片,五月丁香七月婷婷AV,久艹手机视频在线观看,三级片综合福利导航,亚洲黄色3级片定

hotline:0086-577-61673333???? 中文

How to design the low-voltage distribution system of multilayer building?

Date:2017/2/7 16:24:47      Viewed:

(1) the multi-storey building low voltage power distribution design should meet the requirements of measuring, maintenance and management, power supply safe and reliable, lighting and power load should be divided into different distribution system.
(2) the determination of multi-storey residential low-voltage distribution system and the metering, should negotiate with local power supply department can adopt the following several ways:
A. unit total distribution box should be in the first floor, with a total scale.Layer distribution in a separate table by total distribution box distribution box appropriate USES its trunk to layer type distribution, layer distribution box adopts the radial power distribution to the users.
B. do not set a total scale unit, only in hierarchical distribution box set household table, its main distribution, regional distribution methods appropriate USES radial distribution.
C. household metering table all focused on the first floor meter asked, distribution feeder with radial distribution to each user.
(3) multilayer residential lighting measurement should be a home a table.For public channel, stair illumination measurement, when the power supply department charge to households can set the public watt-hour meter, such as total table to the floor is generally not another set table.
(4) other than multi-storey residential multilayer civil construction.For larger concentrated load or more important load, should from the transformer room on radial distribution for each layer distribution or distribution box distribution, appropriate USES tree type trunk or partition type way.
(5) the distribution scope of the each type trunk circuits should be in power load density, properties, maintenance and management, and fireproof partition condition into account.
(6) by the layer distribution or distribution box to the distribution of electric power distribution box, appropriate USES radial or with the combination of tree trunks.
(7) in the multilayer residential electricity meter should be installed separately.Other layers of civil building lighting and electrical load should also be measured respectively set table.
(8) multilayer single dormitory building, appropriate for each room, electricity power brownouts measures, on the system wiring should be considered.

Prev:How to design residential area of low-voltage distribution system?
Next:Low voltage distribution system
Add:No. 310 Wei 17th Road, Yueqing Economic Development Zone, Yueqing City, Wenzhou City, Zhejiang Province, China hotline: 0086-577-61673333  
? Zhejiang COTTOH Electric Co.,Ltd. All rights reserved.
制服丝袜性爱影片| 亚洲拍拍拍拍| 少妇69视频| 久久aaa| 亚洲一区 无码高清| 特级国产A片| 日韩AV福利片| 日韩资源 日韩有码| 91AV在线电影| 亚洲AV专区在线观看| 一级黄色影片69| 成人毛片成人色情片| 国产人人看人操| 日韩91无码| 日韩人妻无码专区| 免AV网站| 特级A毛毛片| 曹先生探花视频| 99aV91| 一级A片免费观看| 国产精品一级在线| 91一级黄色视频| 亚洲操逼视频| 三级黄色毛片| 91成人精品一区二区| 人妻视频一区二区| 免费观看黄色A片| 情爱AV91| 久久超碰AV| 亚洲色狼友| 青青草原网老司机| 91看免费看NB大片| 美女黄频aa免费| 日韩欧美一区二区三四区| 无码一97| 特级毛片aaa| 黄总Av在线免费观看| 91超碰在线| 成人码一区二区片| 五月天激情中文字幕AV| 日韩真人黄|