高清无码加勒比图片,五月丁香七月婷婷AV,久艹手机视频在线观看,三级片综合福利导航,亚洲黄色3级片定

hotline:0086-577-61673333???? 中文

How to design the low-voltage distribution system of multilayer building?

Date:2017/2/7 16:24:47      Viewed:

(1) the multi-storey building low voltage power distribution design should meet the requirements of measuring, maintenance and management, power supply safe and reliable, lighting and power load should be divided into different distribution system.
(2) the determination of multi-storey residential low-voltage distribution system and the metering, should negotiate with local power supply department can adopt the following several ways:
A. unit total distribution box should be in the first floor, with a total scale.Layer distribution in a separate table by total distribution box distribution box appropriate USES its trunk to layer type distribution, layer distribution box adopts the radial power distribution to the users.
B. do not set a total scale unit, only in hierarchical distribution box set household table, its main distribution, regional distribution methods appropriate USES radial distribution.
C. household metering table all focused on the first floor meter asked, distribution feeder with radial distribution to each user.
(3) multilayer residential lighting measurement should be a home a table.For public channel, stair illumination measurement, when the power supply department charge to households can set the public watt-hour meter, such as total table to the floor is generally not another set table.
(4) other than multi-storey residential multilayer civil construction.For larger concentrated load or more important load, should from the transformer room on radial distribution for each layer distribution or distribution box distribution, appropriate USES tree type trunk or partition type way.
(5) the distribution scope of the each type trunk circuits should be in power load density, properties, maintenance and management, and fireproof partition condition into account.
(6) by the layer distribution or distribution box to the distribution of electric power distribution box, appropriate USES radial or with the combination of tree trunks.
(7) in the multilayer residential electricity meter should be installed separately.Other layers of civil building lighting and electrical load should also be measured respectively set table.
(8) multilayer single dormitory building, appropriate for each room, electricity power brownouts measures, on the system wiring should be considered.

Prev:How to design residential area of low-voltage distribution system?
Next:Low voltage distribution system
Add:No. 310 Wei 17th Road, Yueqing Economic Development Zone, Yueqing City, Wenzhou City, Zhejiang Province, China hotline: 0086-577-61673333  
? Zhejiang COTTOH Electric Co.,Ltd. All rights reserved.
国产一区自拍AV| 免费AV看| 一级aV导航在线播放| 69无码精品| 毛片特级毛片| 五月涩婷婷| 91午夜视频| 一级a卡片免费观看| 91黄色一级片| av中文网| 欧洲一级二级| jiucaoav| 特级无码毛片| 久草AV在线免费| 1级黄色无吗片| 欧美A片在线视频| 超碰先锋影音| av久操| 骚货丝袜| AAV网站| 在线播放的黄色av网址| 91 69视频| 97停停六月天| 成人A片无码| 亚洲AV网址在线| 丁香五月亚洲色图| 日本高清无码50| 色情干女毛片| 欧美一级婬片A片免费放| 色五月少妇| 五区毛片七区毛片| 无码一区无码二区| 日韩AV无码视屏| 欧美成人影片| 婷婷色加勒比| 无码AV资源| 免费日韩AV在线| 少妇69视频| 曰韩A级毛片| 日本精品一本二本| 免费无码婬片A片|